A Step-by-Step Guide to Installing AAC Blocks

Lined Circle

Prepare the Foundation

Prior to AAC block installation, prep a sturdy foundation: Clear area, excavate, compact soil, lay geotextile, then pour concrete.

Plan the Layout

Plan wall layout, measure dimensions, mark foundation, align with reference lines. Consider openings, corners, fixtures.

Apply Mortar

Prior to AAC block installation, prep a sturdy foundation: Clear area, excavate, compact soil, lay geotextile, then pour concrete.

Place the AAC Blocks

Begin by positioning AAC blocks on mortar, maintaining level with spirit level. Cut for corners. Ensure precise alignment and mortar filling.

Fill the Joints and Reinforce

Fill joints with mortar, add vertical/horizontal reinforcement for sturdy AAC block structures, ideal for seismic areas.

The Finishing

After mortar dries, use a wire brush to remove excess. Apply paint or render for protection. Optionally, add plaster for a smooth finish.

Want to learn more?